|

Build Your Online Product Catalogs?
Product Name: |
Blast furnace size clock
|
Supply Ability: |
|
Related proudcts |
release valve, |
Specifications |
Blast furnace size clock |
Price Term: |
|
Port of loading: |
|
Minimum Order |
|
Unit Price: |
|
|
Sealing and Fabric Mechanism&©| 8204; £º The large and small clocks alternate opening and closing to prevent gas leakage and achieve layered falling of furnace materials. When the large bell is closed, a sealed ***ce is formed, and when the small bell is opened, the furnace material is introduced into the large bell platform; The big bell then turned on, and the furnace charge fell into the throat of the blast furnace. &©|8204; &©|8204; The small clock is equipped with a rotating funnel (with a speed of about 20 revolutions per minute), which breaks the tip of the furnace material pile through centrifugal force and promotes uniform distribution. &©|8204; &©|8204; &©|8204; Furnace material distribution adjustment&©| 8204; £º The bottom area of the large bell is about half of the cross-section of the furnace throat, and the gap between the furnace throats is fixed (450-700 millimeters for medium and small blast furnaces). By adjusting the height of the material line, the angle of the furnace material pile can be changed, which affects the distribution of gas flow at the edge and center. &©|8204; &©|8204; The larger the ratio of the diameter of the bell to the throat, the faster the tip of the pile moves towards the center, and the stronger the edge gas flow; On the contrary, the central gas resistance increases. &©|8204; &©|8204; |
Company: |
Luohe Longbai Machinery Equipment Co., Ltd
|
Contact: |
Mr. zhao guangyao |
Address: |
Yinhe Bay Community, Yancheng District, Luohe City |
Postcode: |
|
Tel: |
000 |
Fax: |
000 |
E-mail: |
|
|
|
|